
Solving the recycling issue,
right where it starts.
Detect
AI sensors scan each item the moment it enters the bin — identifying material type, product info, and contamination level in real time.
Sort
A mechanical routing system separates PET, glass, aluminum, and general waste into dedicated chambers — automatically, without user input.
Process
PET bottles are crushed, drained, delabeled, and compacted at intake — removing contaminants before they ever reach downstream facilities.
Monitor
Real-time capacity and status data is pushed to operations teams — enabling proactive collection before overflow and continuous quality tracking.
Eliminate missorting
Correct sorting happens automatically — regardless of recycling knowledge.
Reduce labor costs
Preprocessing at intake lowers cost per tonne and frees staff for higher-value work.
Prevent overflow
Real-time capacity alerts keep high-traffic spaces clean before problems occur.
Collect valuable data
Every deposit is logged — feeding a live dataset for logistics, purchasing, and sustainability reporting.
| Core Features | |
| Detection | AI and multi-sensor array identifies material type, condition, and product information at the point of insertion. |
| Sorting | Automatically separates waste into three streams — PET bottles, recyclables (glass, aluminum), and general waste. |
| Processing | PET bottles are de-capped, drained, de-labeled, and compacted at intake — no downstream cleaning required. |
| Monitoring | Real-time fill-level sensing across all chambers. Staff receive automatic IoT alerts when any chamber reaches capacity. |
| Data logging | Every deposit is recorded — material type, condition, quantity, and timestamp — for logistics, reporting, and ESG metrics. |
| Physical | |
| Dimensions | W 370 × H 1820 × D 620 mm |
| Capacity | 154 L totalPET 76 L · Recyclables 33 L · General waste 45 L |
AIoT smart bin development
In ProgressFull-scale demo unit
Early 2027Pilot / PoC deployment
2027+AIoT smart bin development
In ProgressFull-scale demo unit
Early 2027Pilot / PoC deployment
2027+





